Software engineering multiple choice questions and answers Part 5
- Efficiency in a software product does not include ________
- licensing
B. processing time
C. responsiveness
D. memory utilization
Ans : A
- What are attributes of good software ?
- Software functionality
B. Software development
C. Software maintainability
D. Both A and C
Ans : D
- 92. Process models are described as agile because they
- Eliminate the need for cumbersome documentation
- Emphasize maneuverability and adaptability
- Do not waste development time on planning activities
- Make extensive use of prototype creation
Answer B. Emphasize maneuverability and adaptability
- Which of these terms are level names in the Capability Maturity Model?
- Performed
- Repeated
- Reused
- Optimized
- both a and d
Answer E. both a and d
- The best software process model is one that has been created by the people who will actually be doing the work.
- True
- False
Answer A. True
- Which of the following are recognized process flow types?
- Concurrent process flow
- Iterative process flow
- Linear process flow
- Spiral process flow
- both b and c
- The communication activity is best handled for small projects using six distinct actions (inception, elicitation, elaboration, negotiation, specification, validation).
- True
- False
Answer B. False
- A good software development team always uses the same task set for every project to insure high quality work products
- True
- False
Answer B. False
- Software processes can be constructed out of pre-existing software patterns to best meet the needs of a software project
- True
- False
Answer A. True
- Which of these are standards for assessing software processes?
- SEI
- SPICE
- ISO 9000
- ISO 9001
- both b and d
Answer E. both b and d
- Which of the following activities is not part of the software reengineeringprocess model?
(a) Forward engineering
(b) Inventory analysis
(c) Prototyping
(d) Reverse engineering
Answer: c) Prototyping
- Software reengineering process model includes restructuring activities forwhich of the following work items?
(a) Code
(b) Documentation
(c) Data
(d) All of the above
Answer: d) All of the above